At the airport Panamá new terminal opens, which will haveá an additional capacity of 10 million passengers per year. Press photos Tocumen Airport.
The Am Hubérich follow a growth, which was más that necessary to support the big operationón of its main operator Copa Airlines, and the past 29 of April before authorities and guests was inauguratedó permanently and definitively the Terminal 2 from the Tocumen International Airport that serves Panama Cityá.
With it inaugurate usón of what were the first 5 Boarding gates, will gradually be inauguratedán the rest of a total of 20 sleeves and 8 remote positions with the potential to receive aircraft of different sizesños and tonnage the airport moves to a new stage of its growth and positioning as one of the main Hub de Latinoamérica.
Spaghettién, was inauguratedó a new luggage transport system with the capacity to transport más de 6.500 bags per hour, what to allowá la connectionión effective between flights arriving at the Terminal 1 or to Terminal 2 and keep the times between international flights.
In a construction spaceón of más de 116.000 square meters is located the new terminal that added to the Terminal 1 add up to a total of 57 boarding gates and 8 remote. Se implementó el sistema One Stop Security – OSS that allows to improve operational efficiency, optimizing security resources under ICAO standards according to a Validation Processón between states.
With this constructionón the Airport is now considered the más largest of the regionón.
During the 2018 This airport was considered the medium-sized terminal más punctual world under parámeters OTP.
Más de 6.000 workers were responsible for the constructionówhat a startó in the AñO 2012 and that I sufferedó several delays during your process.
with the first 5 Terminal gates 2 it will be possibleán process 58 additional flights and más de 6 thousand passengers.
In the úlast déeach by Panama Airportá, have quadrupled the numberúpassenger grouper, reaching outíoperational mites, so the expansionóIt was necessary to maintain this growth hand in hand with the arrival alsoén of new aerolíEuropean lines.
a hallway 172 meters long connects the Terminal 1 with the 2, below this runs the interconnected case system.