At Lima airport new boarding rooms are inaugurated to promote, in something, to the main terminaléarea of Perú.
«Welcome to Jorge Ch International Airportáturn, located in the constitutional province of Callao that serves the city of Lima». This is the traditional phrase thatíwe landed at this airport, the más important of Peruú, as possibly alsoén one of the mácollapsed s of Latin Americaérich who receives más de 20 million passengers per year.
in this terminal, the aerosolsílines do not stop growing as are the más new Viva Air Perú and Sky Airline Perú, but this growth has challengesíos in infrastructure and Lima Airport Partners carries out various jobs in the little space available to meet these requirements of the operators and grow the facilities.
New departure lounges
With an inverseón of $3.5 millions of dóhomes, works carried out include 5 new boarding gates, which adds up to a total of 44 exit doors intended for attentionónumber of domestic flights.
Thanks to the realizationón of these improvements, The airport operator estimates that it will provide a better service to 20.607 additional passengers daily.
“We are very happy to present this new space, which allows us to improve and optimize our services for the benefit of passengers and terminal users. Is úlast improvement, allow usá expedite in a 10% the flow of attentionón of domestic passengers and better reorder those flights that take off at simultaneous timesáneos”, I knowñaló Pamela Moreno, Operations Manager of Lima Airport Partners.
Thanks to these works, the size has increasedñor and capacity for attentionón of passengers with national destinations. Are youí what, the departure lounges located on the first floor have capacity for 148 people, while those on the second floor, with this new extensionón, for 345 passengers.
It should be noted that part of the remodeling projectón of the national hall, includedó the expansionón of baggage claim room, inaugurated at the end of 2018; the expansionón of national departure lounges; and the úLast phase of the project includes the expansionón of the national check-in area, which will haveá 18 new positions of careón and beá open to púwar in the prónext weeks.