I was able to explore what to beá the new terminal Jorge Ch Airportátime of Lima, a mega work to beá the first airport city in Latin Americaérica.
The Jorge Ch International Airportáturn from Lima, Perú, is in the process of transformationón with the constructionón of a new passenger terminal. This work, considered a milestone in Latin America's airport infrastructureérica, to allowá to the airport to increase its capacity and provide a better experience to passengers.
After severalños of delay and a máIt is necessary constructionón of new infrastructure, I was able to know and tour (much) of what since 18 from December to 2024 to beá the brand new terminal of one of the airports máimportant s of the regionón.
77% ready for the new terminal at Lima Airport
On an exclusive visit and thanks to the support of Lima Airport Partners – LAP, resortí the works of the mega work, one of the investments más important in the history of Perú and alsoén from Latin America.
I invite you to review this Aero Report, so that they can see the magnitude of the new infrastructure thaté Eastá a 77% list and that in December changeá, al fin, the experience of passengers who use the Airport Lima as final destination or in connectionón, available on YouTube:
CharacteríStatics of the New Terminal:
Let's now review the main characteristicsístatics that will haveá the new terminal, which without a doubt beá a huge leap in every sense for the Airport.
- The new terminal will haveá a capacity of 40 million passengers per yearñor en 2025, which represents a significant increase compared to the current capacity of 22 millions.
- On 2024 the terminal will haveá capacity of 30 initial million.
- He saysño terminal is modern and functional, inspired by Peruvian culture, the hummingbirdí of the líNazca lines. The facade isá composed of a glass and metal structure that allowsá the entry of natural light.
- The new terminal will beá equipped with technologyíto of úlast generationón to facilitate the boarding and disembarkation process of passengers. This includes self-check-in systemsático, biom security controlétrico and boarding gates with telesc sleevesópizzas.
- The terminal countá with 46 Boarding gates, of which 9 ya isán installed.
- In December, the terminal opená with 210 thousand square meters of constructionón and the 2025 will expandá until the 230 thousand square meters.
- The terminal countá with a wide range of services for passengers, including shops, VIP lounges, restaurants, cafés, árest and entertainment areas.
- The constructionón of the new terminal is beingá carrying out with environmental sustainability criteria. be usedán recycled materials and implementedán measures to reduce energy consumptionía and water. Spaghettién a waste treatment plant is built.
- It is expandable, themselvesúIf necessary, new expansions can be developed to increase capacity or meet parameters.áquality meters established in the concession contractón.
Many máI'll tell you the details in the video above..
Cost of Reversesón
You reverse itótotal in constructionón of the new Jorge Ch Airport terminalátime it ascends to meás de 2.000 millions of dóhomes. The financing of the project comes 100% of the efforts of private, which guarantees an economical flowómic to achieve the más violas isáconstruction divisionón, technologyía and security.
Benefits of the New Terminal
The new Jorge Ch Airport terminaláonce generateá a series of benefits for the país, among them, más of the current 6.000 direct jobs currently generated, greater dynamism is expected in tourism and employment in the countryís thanks to the aerosolíneas podrán increase without limitations its operations in the countryís.
- The new terminal allowá to the airport to attend to the growth of trafficáI'm theéprisoner in Peruú and Latinamérica.
- The new terminal will offerá a better passenger experience with modern facilities, technologyíto of úlast generationón and a wide range of services.
- The constructionón y operationón of the new terminal generateá thousands of direct and indirect jobs and since the opening an increase of thousands of jobs is expected at the Airport.
- The new terminal helpá to boost tourism in Peruú by improving the connectivity of the país with the rest of the world.
The new Jorge Ch Airport terminaláIt is perhaps a large-scale project to transformá the airport panorama of Latin Americaérich and locateá to the Lima Hub in oneún better positionón against your competition. The terminal providesá a better passenger experience, boostá tourism and generateá employment.
A work máyes it is necessary, given the collapse of the current terminal, to allowá in Peruú make a quantitative leap towards excellence in service toéreo and being the initial starting and ending door for millions of tourists to theñO, helpá for the traveler's perspective to improveún más.
Beé atento a la inaugurationón of the new terminal in December and I hope to be able to attend to bring youún más details of this mega work, which together with the new control tower and second runway, Eastán giving new life to such an important terminaléevil from the kingsón.